West Wales lines

















West Wales lines

Viaduct at Tenby - geograph.org.uk - 479143.jpg

Tenby Viaduct

Overview
TypeHeavy Rail
SystemNational Rail
Locale
Wales
Swansea
Carmarthenshire
Pembrokeshire
Operation
Opened1868
OwnerNetwork Rail
Technical
Number of tracks
Double track Swansea to Clarbeston Road (remainder single line)
Track gauge
4 ft 8 12 in (1,435 mm) standard gauge

.mw-parser-output .RMboxbox-shadow:0 2px 2px 0 rgba(0,0,0,.14),0 1px 5px 0 rgba(0,0,0,.12),0 3px 1px -2px rgba(0,0,0,.2).mw-parser-output .RMinlinefloat:none;width:100%;margin:0;border:none.mw-parser-output table.routemappadding:0;border:0;border-spacing:0;background:transparent;white-space:nowrap;line-height:1.2;margin:auto.mw-parser-output .RMirborder:0;border-spacing:0;display:table;line-height:0;padding:0!important;margin:0 auto!important.mw-parser-output table.routemap .RMsidisplay:inline;font-size:90%.mw-parser-output table.routemap .RMl1padding:0 3px;text-align:left.mw-parser-output table.routemap .RMr1padding:0 3px;text-align:right.mw-parser-output table.routemap .RMltext-align:right.mw-parser-output table.routemap .RMrtext-align:left.mw-parser-output table.routemap .RMl4padding:0 3px 0 0;text-align:left.mw-parser-output table.routemap .RMr4padding:0 0 0 3px;text-align:right.mw-parser-output table.routemap>tbody>trline-height:1.mw-parser-output table.routemap>tbody>tr>tdpadding:0;width:auto;vertical-align:middle;text-align:center.mw-parser-output .RMir>tbody>trdisplay:inline-table.mw-parser-output .RMir>tbody>tr>tdpadding:0;height:20px;min-height:20px.mw-parser-output .RMir .RMovposition:relative.mw-parser-output .RMir .RMicposition:absolute;left:0px;top:0px;padding:0.mw-parser-output .RMir .RMtxline-height:20px;vertical-align:middle;text-align:center.mw-parser-output .RMir .RMspheight:20px;min-height:20px.mw-parser-output .RMir div>.RMtxposition:absolute.mw-parser-output .RMir .RMtx>abbr,.mw-parser-output .RMir .RMtx>divline-height:.975;display:inline-block;vertical-align:middle.mw-parser-output .RMir .RMf_height:5px;min-height:5px;width:20px;min-width:20px.mw-parser-output .RMir .RMfmheight:100%;min-height:100%;width:4px;min-width:4px;margin:0 auto.mw-parser-output .RMir .RMowidth:2.5px;min-width:2.5px.mw-parser-output .RMir .RMcwidth:5px;min-width:5px.mw-parser-output .RMir .RMocwidth:7.5px;min-width:7.5px.mw-parser-output .RMir .RMdwidth:10px;min-width:10px.mw-parser-output .RMir .RModwidth:12.5px;min-width:12.5px.mw-parser-output .RMir .RMcdwidth:15px;min-width:15px.mw-parser-output .RMir .RMocdwidth:17.5px;min-width:17.5px.mw-parser-output .RMir .RM_width:20px;min-width:20px.mw-parser-output .RMir .RM_owidth:22.5px;min-width:22.5px.mw-parser-output .RMir .RM_cwidth:25px;min-width:25px.mw-parser-output .RMir .RM_ocwidth:27.5px;min-width:27.5px.mw-parser-output .RMir .RM_dwidth:30px;min-width:30px.mw-parser-output .RMir .RM_odwidth:32.5px;min-width:32.5px.mw-parser-output .RMir .RM_cdwidth:35px;min-width:35px.mw-parser-output .RMir .RM_ocdwidth:37.5px;min-width:37.5px.mw-parser-output .RMir .RMbwidth:40px;min-width:40px.mw-parser-output .RMir .RMcbwidth:45px;min-width:45px.mw-parser-output .RMir .RMdbwidth:50px;min-width:50px.mw-parser-output .RMir .RMcdbwidth:55px;min-width:55px.mw-parser-output .RMir .RM_bwidth:60px;min-width:60px.mw-parser-output .RMir .RM_cbwidth:65px;min-width:65px.mw-parser-output .RMir .RM_dbwidth:70px;min-width:70px.mw-parser-output .RMir .RM_cdbwidth:75px;min-width:75px.mw-parser-output .RMir .RMswidth:80px;min-width:80px.mw-parser-output .RMir .RMdswidth:90px;min-width:90px.mw-parser-output .RMir .RM_swidth:100px;min-width:100px.mw-parser-output .RMir .RM_dswidth:110px;min-width:110px.mw-parser-output .RMir .RMbswidth:120px;min-width:120px.mw-parser-output .RMir .RMdbswidth:130px;min-width:130px.mw-parser-output .RMir .RM_bswidth:140px;min-width:140px.mw-parser-output .RMir .RM_dbswidth:150px;min-width:150px.mw-parser-output .RMir .RMwwidth:160px;min-width:160px.mw-parser-output .RMir .RM_wwidth:180px;min-width:180px.mw-parser-output .RMir .RMbwwidth:200px;min-width:200px.mw-parser-output .RMir .RM_bwwidth:220px;min-width:220px.mw-parser-output .RMir .RMswwidth:240px;min-width:240px.mw-parser-output .RMir .RM_swwidth:260px;min-width:260px.mw-parser-output .RMir .RMbswwidth:280px;min-width:280px.mw-parser-output .RMir .RM_bswwidth:300px;min-width:300px


West Wales lines


Legend





















































































































































































































































































South Wales Main Line









Landore Junction












Landore TMD














Swansea








Swansea Loop West Jn









Cockett Tunnel









Cockett








Gowerton










Llanelly Railway









Loughor










Loughor railway viaduct
over River Loughor



Heart of Wales line and
Swansea District line



















Llanelli

Burry Port and
Gwendraeth Valley Railway











Pembrey and Burry Port












Burry Port

























Burry Port and
Gwendraeth Valley Railway












Burry Port and
Gwendraeth Valley Railway



















Lando Platform








Kidwelly Flats Halt








Kidwelly

Carmarthen–
Aberystwyth line











Ferryside

Carmarthen









Carmarthen Junction
(original)





















River Towy









Sarnau








St Clears








Whitland Tunnel









Whitland
















Narberth

Whitland & Cardigan Rly









Narberth Tunnel


Clunderwen










Templeton

Narberth Road and
Maenclochog Railway










Kilgetty

Clarbeston Road









Saundersfoot

Haverfordwest














Tenby

River Cleddau










Penally

Johnston











Lydstep Halt

Neyland










Manorbier

Waterston oil refinery











Beaver's Hill Halt

Robeston oil refinery











Lamphey

Milford Haven











Golden Hill Platform

Newton Noyes











Llanion Halt

Hakin Docks










Pembroke

Spittal Tunnel










Pembroke Dock ferry/water interchange








Wolf's Castle Halt

Narberth Road and
Maenclochog Railway











Welsh Hook Halt

RNAD Trecwn














Mathry Road












Jordanston Halt







Fishguard
and Goodwick








ferry/water interchange Fishguard Harbour














The West Wales lines (Welsh: Llinellau Gorllewin Cymru) are a group of railway lines from Swansea through Carmarthenshire to Pembrokeshire, West Wales. The main part runs from Swansea to Carmarthen and Whitland, where it becomes three branches to Fishguard, Milford Haven and Pembroke Dock.


Before the rail cuts of the 1960s, there were routes to Cardigan, Newcastle Emlyn, Llandysul, and via Lampeter, cross-country from Carmarthen to Aberystwyth.




Contents





  • 1 The route

    • 1.1 Swansea to Whitland


    • 1.2 Pembroke Dock branch


    • 1.3 Whitland to Clarbeston Road


    • 1.4 Milford Haven branch


    • 1.5 Fishguard branch



  • 2 History


  • 3 Services

    • 3.1 Great Western Railway

      • 3.1.1 Winter services


      • 3.1.2 Summer services


      • 3.1.3 Historical services



    • 3.2 Transport for Wales

      • 3.2.1 Regular services


      • 3.2.2 Other services



    • 3.3 Freight



  • 4 Usage


  • 5 SailRail


  • 6 Plans


  • 7 References


  • 8 Further reading




The route


The cities, towns and villages served by the route are listed below. Towns in italics are served by InterCity express services.



Swansea to Whitland



  • Swansea
    • connection with South Wales Main Line

  • Gowerton


  • Llanelli
    • connection with Heart of Wales line and Swansea District line

  • Pembrey and Burry Port


  • Kidwelly (request stop)


  • Ferryside (request stop)

  • Carmarthen


  • Whitland (junction for Pembroke Dock branch, served by Intercity services on Summer Saturdays)


Pembroke Dock branch


All stations on this line are served by at least one of the two Intercity services that run down this line on Summer Saturdays.



  • Narberth (request stop)


  • Kilgetty (request stop)


  • Saundersfoot (request stop)

  • Tenby


  • Penally (request stop)

  • Manorbier


  • Lamphey (request stop)

  • Pembroke

  • Pembroke Dock


Whitland to Clarbeston Road



  • Clunderwen (request stop). Former junction for the North Pembrokeshire and Fishguard Railway.


  • Clarbeston Road (request stop, junction for Milford Haven and Fishguard branches)


Milford Haven branch


  • Haverfordwest


  • Johnston (request stop)

  • Milford Haven


Fishguard branch


  • former connection with the North Pembrokeshire and Fishguard Railway. It closed in May 1949.

  • Fishguard and Goodwick

  • Fishguard Harbour


History


The railway to west Wales was first projected in 1844, and the proposal was for a line to run from the Great Western Railway near Gloucester to Fishguard, with a branch from Whitland to Pembroke. The railway was called the South Wales Railway, and although it was in theory independent of the G.W.R, in practice it was very closely linked. This was shown by the fact that Isambard Kingdom Brunel was the engineer, and the line was laid to the 7 ft (2,134 mm) broad gauge.


Construction began in 1847, but the company ran into financial difficulties. In addition, the Irish potato famine reduced the prospective revenue from Anglo-Irish traffic. As a result, instead of completing the line to the proposed port at Fishguard, the Haverfordwest branch was extended to Neyland, where a harbour could be provided more cheaply.


The line from Swansea opened as far as Carmarthen on 11 October 1852; then to Haverfordwest on 2 January 1854; and finally to its terminus at Neyland on 15 April 1856. At first, the railway was leased to the G.W.R., but in 1863 the two companies were amalgamated.





Swansea railway station



The original powers for the branch to Pembroke lapsed, and so in 1859 the Pembroke and Tenby Company was authorised to build a 4 ft 8 12 in (1,435 mm), standard gauge, line from Pembroke Dock to Tenby. The line opened from Tenby to Pembroke on 30 July 1863, and to Pembroke Dock on 8 August 1864. The extension from Tenby to the G.W.R. line at Whitland opened on 4 September 1866. There were two adjoining stations at Whitland with no physical connection between the two lines because they operated on different gauges.[1]


The line was engineered by Sir James Szlumper.[2] It had its own police force until 1897, due to the high-security of the Naval Dockyard at Pembroke Dock, and the munitions transported.[3]


The Pembroke & Tenby Company obtained powers in 1866 to extend their standard-gauge line from Whitland to Carmarthen. This would have enabled the Pembroke & Tenby to link up with the standard-gauge network through the Llanelly Railway, the Vale of Towy Railway and the Central Wales line. Through a series of inter-company working agreements, this would have had the effect of giving the London & North Western Railway unrestricted access to west Wales. Within the Act for the extension to Carmarthen was a Schedule which allowed either party (the Pembroke & Tenby or the Great Western) to request the Great Western for running powers to the Pembroke company. In doing this the cost of adding a rail to mix the gauge and installing the necessary junctions at Whitland and Carmarthen was £20,000 to be paid to the Great Western within 18 months of the request. The request was made by the Pembroke company and consequently the Great Western converted the up line to standard gauge leaving the down line purely as broad. This was not what the Pembroke company was wanting but had to live with it. The Great Western maintained a crossing loop at St Clears for the broad gauge and this caused some hindrance to the Pembroke company. The conversion is noted as the first pure broad to standard gauge for the Great Western.




First Great Western high speed service at Carmarthen railway station


The Pembroke & Tenby ran the first goods trains to Carmarthen on 1 June 1868, and passenger services in August 1869.


The Pembroke & Tenby was leased by the G.W.R on 1 July 1896 and finally 'amalgamated' with it a year later.[1]


In 1895, the Rosebush line was opened from Clynderwen to Letterston along the old Maenclochog line, and construction started on extending it to Goodwick and the proposed new harbour at Fishguard. A Bill was approved by Parliament for the railway to extend eastwards to Carmarthen, although this was stopped when the line was bought out by the Great Western Railway in 1898.


In 1906, the railway was extended from Letterston to Fishguard & Goodwick, followed in 1909 with Fishguard Harbour.


The Rosebush line was stopped during World War I, and in 1917, the line is removed to provide rails for the army in France. The line was relaid in 1923, but passenger services stopped in 1937, and the line closed in 1949.


The first freight line to the Oil Refineries was built in 1960 when Esso opened their first refinery in Milford Haven.
Passenger services stopped on The Whitland and Cardigan branch in 1962, followed by freight in 1963. The line to Neyland followed in 1964. Pembrokeshire escaped lightly from the 1963 Beeching Report as none of the remaining three branches - to Fishguard, Milford Haven, and Pembroke Dock via Tenby - were proposed for closure. The Pembroke Dock branch survived a later closure proposal, in the late 1960s.



Services


Until 2013, train services on the West Wales line were sub-optimally distributed. Calling patterns were compromised, by the existence of a stretch of single track on the otherwise double-track main line. This 5 miles (8.0 km) stretch of single track is between Cockett West Junction in the western suburbs of Swansea and Duffryn West Junction to the east of Llanelli. Within this section the River Loughor was crossed on a viaduct which required significant works to accommodate two tracks.[4] Plans were advanced to replace the viaduct and restore double track, expected to be complete in 2013.[5]





Fishguard and Goodwick railway station in 1850


One intermediate station, Gowerton, also lies on this single-track stretch, with just the former Down (i.e. westbound) platform in use for trains in either direction. The disused former Up platform (without track) is still in existence. Less than half of all trains passing through Gowerton can be scheduled to make stops owing to pathing limitations. Additionally, this tight pathing compromised route performance which can amplify delays and hence impact connections into and out of the long-distance Intercity services between Swansea, Cardiff and London. This is important since there are many interchange passengers from the Pembroke Dock line (which is mainly served by trains terminating at Swansea) for Cardiff and English destinations.


The double tracking work between Cockett and Dyffryn was completed by July 2013 with a revamped Gowerton railway station having the disused platform brought back into use. This resulted in Gowerton railway station having an additional 95 trains stopping there every week.[6]
Additional problems are also found on the Single Lead Junction at Swansea Loop East junction (north of Swansea station), which causes conflict between trains from west of Swansea and the eastbound mainline High Speed Train services. There are two passenger companies operating; Transport for Wales Rail and Great Western Railway.



Great Western Railway



Winter services




Class 175 DMU en route for Carmarthen


Great Western Railway operate the following services:


  • Monday to Saturday, one morning High Speed Train from Carmarthen to London Paddington, stopping at Pembrey & Burry Port and Llanelli

  • Monday to Saturday, one evening High Speed Train from London Paddington to Carmarthen, stopping at Llanelli and Pembrey & Burry Port

  • Saturdays, one morning High Speed Train from Swansea to Carmarthen

  • Sundays, three morning/afternoon High Speed Trains from London Paddington to Carmarthen, stopping at Llanelli and Pembrey & Burry Port

  • Sundays, three afternoon/evening High Speed Trains from Carmarthen to London Paddington, stopping at Pembrey & Burry Port and Llanelli


Summer services


During the summer months, additional services are provided between Pembroke Dock and London Paddington, although the stopping pattern of these trains are highly constrained due to the single track between Whitland and Pembroke Dock and appear to vary from year to year. In recent years, these trains have taken the path of two of the regular Arriva Trains Wales services with modification to the stations served, and timings at stations other than Pembroke Dock due to the handling characteristics of the High Speed Trains.



Historical services


The following services previously operated by Great Western Railway (and/or one or both of its predecessors First Great Western, Great Western Trains, British Rail and Great Western Railway) no longer operate:


  • Daily services from Milford Haven (and towards the latter years of operating, Haverfordwest) to London Paddington.[7]

  • Daily night time service from Fishguard Harbour to London Paddington, stopping only at Whitland, Llanelli and Swansea

  • Daily daytime service from Fishguard Harbour to London Paddington, stopping only at Whitland and Llanelli, and also operating express to/from London stopping only at Cardiff Central
    • This train was noted for its non-stop service at principal stations like Reading, Bristol Parkway and Newport

  • Daily sleeper service from Milford Haven to London[7]


Transport for Wales



Regular services


Due to the Single Lead Junction at Swansea and the single track between Cockett and Dyfryn, a standard repeating departure time service is not possible,[clarification needed] therefore a non-standard departure time service is operated on these main routes:




Loughor Viaduct crossing the River Loughor



  • Milford Haven to Manchester Piccadilly via Swansea - every two hours


  • Pembroke Dock to Swansea - every two hours
    • A standard repeating departure time trial results in a 58-minute layover at Pembroke Dock, with trains passing each other at Tenby, the only passing loop between Whitland and Pembroke Dock


  • Carmarthen to Manchester Piccadilly via Swansea - every two hours
    • Together with the Milford Haven - Manchester service this makes Carmarthen to Manchester hourly

Most services are timed to provide a connection at Swansea to the High Speed Trains to London Paddington



Other services



  • Fishguard Harbour to Swansea - one train per night, connecting with the night ferry to Rosslare Europort, Ireland


  • Fishguard Harbour to Cardiff Central avoiding Swansea - one train per day (normally via the Swansea District Line), connecting with daytime conventional ferry to Rosslare Europort, Ireland

  • Heart of Wales Line services between Shrewsbury and Swansea (four trains a day) travel over the Swansea to Llanelli section of the West Wales Lines.

  • Irregular local trains to/from Fishguard Harbour (some going only as far east as Clarbeston Road some coming all the way from Cardiff (via Swansea)) which started on 12 September 2011, after a petition organised by two 15-year-olds.[8] Funding will be provided by the Welsh Assembly Government at the cost of £1.4m per annum. One of these extra trains in each direction was expected to connect with the summer-only Stena Lynx fast ferry to Rosslare Europort, Ireland in summer 2012, however Stena line then sold the Lynx fastcraft which means the summer 2012 Lynx service will no longer operate.[9]



Site of former terminus of the West Wales Line, at Neyland (New Milford)



Freight


  • One of the oil refineries near Milford Haven generates daily long distance freight trains.

  • Llanelli steel works generates some freight traffic

The junction on the Fishguard branch to the former North Pembrokeshire and Fishguard Railway, which now leads to the former RNAD Trecwn site, has been refurbished in recent years. Perhaps it was expected that the new owners of Trecwn would generate freight traffic or it may have been in connection with plans for Intermodal freight traffic from Fishguard.



Usage


The majority of usage of the west Wales lines is from Swansea, Llanelli and Carmarthen, the other stations accounting only for a small percentage of journeys. Most rail users drive to one of the major stations (Haverfordwest, Carmarthen, Llanelli) rather than use the smaller stops.[citation needed] Although there is some commuting, traffic west of Tenby and Haverfordwest is very seasonal and includes tourism. Local government is currently proposing to increase the tourist potential of the services. Passenger usage in South Wales has grown by 11.4% between 2001 and 2004 and this trend is expected to continue.[citation needed]



SailRail


Arriva Trains Wales, Iarnród Éireann and Stena Line promotes SailRail[10] using the Fishguard Harbour to Rosslare Europort service which links with the Iarnród Éireann trains to Dublin Connolly on the Dublin–Rosslare railway line.



Plans




Poster advertising the Maenclochog Railway


In August 2006, SWWITCH were apparently performing a business case review of the Fishguard branch, to decide whether it was viable to continue to operate a passenger service, given the very scant (boat-trains only) service. The results of this may have led to the withdrawal of services from Fishguard, or their improvement. The services were not withdrawn and, in 2011, a local campaign resulted in additional services. With extra trains secured, thoughts turned to reopening Fishguard and Goodwick railway station, and an announcement was made that it would reopen in March 2012.[11] However, the reopening was then delayed to coincide with the timetable change on 14 May 2012.[12]


It was announced by the Welsh Assembly Government on 3 December 2008 that funding was secured from the Strategic Capital Investment fund for improvements to be carried out in the section between Gowerton and Loughor.[13] This was completed in July 2013.[14] This did not include the doubling the Single Lead Swansea Loop East junction.


Even without improvements to Swansea Loop East junction, the redoubling through Gowerton has permitted more trains to stop at Gowerton and has decreased train waiting times, improved timetabling and enabled an increase in the frequency of services between Swansea and Llanelli. The re-doubling could facilitate a new station to be opened at Cockettin the near future,[15] although this plan doesn't appear to be being progressed at present (as of 2014).


The replacement of Lougher Bridge with a new, stronger structure, the subsequent redoubling of the line between Swansea and Llanelli, and the reopening on the old platform at Gowerton railway station was completed on 8 July 2013. It has allowed for an increased number of services to stop at Gowerton as well as increase reliability in the area.


Also under consideration by WAG is[when?] changing the status of the Pembroke Dock branch to a community railway and possibly then using light-rail or tram/train vehicles to provide a better and more cost effective service. Currently it is not clear how any such changes would be funded and Network Rail have no plans to perform them.


Plans are under consideration[when?] (by Pembrokeshire County Council) for a new deepwater road/rail intermodal port at Milford Haven.



References




  1. ^ ab "Railway Magazine", October 1959


  2. ^ "Build a Free Website with Web Hosting - Tripod". lycos.co.uk. Retrieved 27 November 2015..mw-parser-output cite.citationfont-style:inherit.mw-parser-output qquotes:"""""""'""'".mw-parser-output code.cs1-codecolor:inherit;background:inherit;border:inherit;padding:inherit.mw-parser-output .cs1-lock-free abackground:url("//upload.wikimedia.org/wikipedia/commons/thumb/6/65/Lock-green.svg/9px-Lock-green.svg.png")no-repeat;background-position:right .1em center.mw-parser-output .cs1-lock-limited a,.mw-parser-output .cs1-lock-registration abackground:url("//upload.wikimedia.org/wikipedia/commons/thumb/d/d6/Lock-gray-alt-2.svg/9px-Lock-gray-alt-2.svg.png")no-repeat;background-position:right .1em center.mw-parser-output .cs1-lock-subscription abackground:url("//upload.wikimedia.org/wikipedia/commons/thumb/a/aa/Lock-red-alt-2.svg/9px-Lock-red-alt-2.svg.png")no-repeat;background-position:right .1em center.mw-parser-output .cs1-subscription,.mw-parser-output .cs1-registrationcolor:#555.mw-parser-output .cs1-subscription span,.mw-parser-output .cs1-registration spanborder-bottom:1px dotted;cursor:help.mw-parser-output .cs1-hidden-errordisplay:none;font-size:100%.mw-parser-output .cs1-visible-errorfont-size:100%.mw-parser-output .cs1-subscription,.mw-parser-output .cs1-registration,.mw-parser-output .cs1-formatfont-size:95%.mw-parser-output .cs1-kern-left,.mw-parser-output .cs1-kern-wl-leftpadding-left:0.2em.mw-parser-output .cs1-kern-right,.mw-parser-output .cs1-kern-wl-rightpadding-right:0.2em


  3. ^ British Transport Police


  4. ^ "Network Rail - Page not found" (PDF). networkrail.co.uk. Retrieved 27 November 2015.


  5. ^ http://www.networkrailmediacentre.co.uk/Press-Releases/RAIL-PLANS-FOR-WEST-WALES-UNVEILED-1954/SearchCategoryID-7.aspx


  6. ^ "Revamped Gowerton train station is on track to fine future". South Wales Evening Post. Retrieved 27 November 2015.


  7. ^ ab Parker, Richard, The Railways of Pembrokeshire, Noodle Books, 2008.
    ISBN 978-1-906419-07-3



  8. ^ "Pupils' petition for more Fishguard trains pays off". BBC News. Retrieved 27 November 2015.


  9. ^ "Farewell as Stena Line's 'Lynx' Fast-Ferry Sets Sail for South Korea". afloat.ie. Retrieved 27 November 2015.


  10. ^ "SailRail". Irishrail.ie. Retrieved 16 April 2015.


  11. ^ "Goodwick railway station near Fishguard to reopen". BBC News. 2 January 2012. Retrieved 2 January 2012.


  12. ^ "Station on track for March opening". Retrieved 15 April 2012.


  13. ^ OnlineWales Internet Ltd 20150411. "Wales Holiday Accommodation – Cottages, Hotels, Bed and Breakfast :: Stay in Wales". Stay in Wales. Retrieved 27 November 2015.


  14. ^ "Welsh Government – Rail Improvement Delivers a New Beginning to South West Wales". wales.gov.uk. 8 July 2013. Retrieved 27 November 2015.


  15. ^ "Network Rail" (PDF). networkrail.co.uk. Retrieved 27 November 2015.



Further reading




Route map:



Template:Attached KML/West Wales Lines

KML is from Wikidata


  • Lewis, Deryck (4–17 May 1989). "Pembroke prospects". RAIL. No. 95. EMAP National Publications. pp. 44–45. ISSN 0953-4563. OCLC 49953699.



















這個網誌中的熱門文章

How to read a connectionString WITH PROVIDER in .NET Core?

Node.js Script on GitHub Pages or Amazon S3

Museum of Modern and Contemporary Art of Trento and Rovereto